Skip to content
Concrete frame of a building under construction, with cranes
Illustrative photo

General contractors · Developers · Landlords · Project managers

Priced from your plans. Kept to your schedule.

Sprayed insulation, crawl-space insulation and drylining as a subcontractor. We price from your plans or tender documents (DCE), then keep to the main contractor’s schedule through to handover.

  • Qualibat RGE 7142
  • Quotes from plans or tender documents
  • Head office in Carbon-Blanc (33)

They trust us

  • Legendre
  • Groupe Coulon
  • Groupe CISN
  • Ossabois
  • Arthea
  • Socateb

Six trade packages, one point of contact

One package or several, new build or retrofit. Each has its own page: when it comes in, what we do, what you receive.

Package 01 · Sprayed thermal insulation
Spray gun and hose, protective gloves
Illustrative photo

Slab soffits, ground floors above car parks, unheated spaces

See package 01
Package 02 · Crawl-space insulation
Mineral wool being fitted between frame studs
Illustrative photo

Insulation boards fixed to the underside of floors

See package 02
Package 03 · Partitions and linings
Drylining operative on stilts with a sander
Illustrative photo

Plasterboard, insulated wall linings, internal partitions

See package 03
Package 04 · Suspended ceilings and boxing-in
Finishing a ceiling before painting
Illustrative photo

Ceilings, soffits and boxing-in of service risers

See package 04
Package 05 · Painting
Spray painting a wall with protected floors
Illustrative photo

Surface preparation, interior painting and finishes

See package 05
Package 06 · Flooring and tiling
Notched tile adhesive and levelling clips
Illustrative photo

Floor coverings, tiling of wet areas and communal areas

See package 06

See all trade packages

What you can’t see

Under the slabs. Under the floors. Behind every partition.

Once the building is handed over, our work disappears behind the boards and under the slabs. Yet it keeps insulating the homes above.

  1. The homes above keep their heat
  2. Insulation sprayed by BATI ISO
  3. Under the slabs
  1. 01 · Spraying

    Under the slabs

    Insulation sprayed onto the underside of concrete slabs, on car park ceilings and in unheated spaces. The homes above keep their heat.

  2. 02 · Crawl space

    Under the floors

    Insulation boards fixed beneath the ground floor, inside the crawl space.

  3. 03 · Drylining

    Behind every partition

    Partitions, insulated linings, suspended ceilings and boxing-in: the plasterboard that finishes the building.

Flagship projects

See all projects
  • Retail · Public buildingFlagship project

    Galeries Lafayette remodelling – Arthea

    Bordeaux (33)

    Department store, public building · remodelling · 2026

  • Housing · Sprayed insulationFlagship project

    ALPHA project – Groupe CISN

    Nantes (44)

    Block MF6, housing · sprayed insulation (package 03 of the contract) · 2026

More references available on request.

How we work

  1. Survey and quote

    From plans, specifications (CCTP) or tender documents (DCE): areas, thicknesses and products that meet the project specification.

  2. Full technical file

    Technical data sheets and assessments for the technical inspector (bureau de contrôle), site health and safety plan (PPSPS) for the health and safety coordinator (CSPS).

  3. Coordinated works

    Schedule agreed with the general contractor, the works coordinator (OPC) and the other trades.

  4. Handover and as-built file

    Internal quality check, completion report and product data sheets for the as-built file (DOE).

Free quote

Based in Carbon-Blanc, working across France

Head office in Carbon-Blanc, on the right bank of Bordeaux. Recent sites in Gironde, Dordogne, the Basque Country, the Paris region and Nantes. We travel anywhere in France: give the town of the site in your request.

Head office · Carbon-Blanc (33)

Towns of our recent sites

The towns of our recent sites, linked to the head office in Carbon-Blanc.

  • Bordeaux (33)
  • Nantes (44)
  • Urrugne (64)
  • Coulounieix-Chamiers (24)
  • Villebon-sur-Yvette (91)
  • Clichy (92)
  • How do I get a quote?

    Send us your plans or tender documents (DCE) through the quote form, or a download link if the file is large. We price from the plans and send you a quote with the technical data sheets of the proposed products.

  • Which documents do you provide before work starts?

    The technical data sheets and technical assessments (avis techniques) of the products for the technical inspector (bureau de contrôle), and the site health and safety plan (PPSPS) for the health and safety coordinator (CSPS).

  • Where do you work?

    Anywhere in France, from our head office in Carbon-Blanc, Gironde. Our recent sites are in Gironde, Dordogne, the Basque Country, the Paris region and Nantes.

  • How quickly do you respond to a tender?

    We work to your bid deadline: give it in your first message and we will tell you straight away whether we can meet it.

Send us your plans

Send your plans (PDF or DWG) and the specification or full tender file. Your quote includes the product data sheets. Free, no obligation.