Package 03 · Partitions and linings
Partitions and linings
We build internal partitions and insulated linings in plasterboard, from multi-unit housing to retail spaces. Frames, insulation and boards are installed in line with the contract documents, with finishes ready for painting.

When this trade package comes in
Multi-unit housing
Partitions between rooms and insulated linings on external walls.
Retail and public-access buildings
Partitioning of sales floors, stockrooms and staff areas.
Modular construction
Partitions and linings inside the modules, depending on how the project is organised.
Energy retrofits
Insulated linings installed against existing walls.
What we do
In the schedule
Partitions go up once the building is weathertight, in coordination with the electrician and the plumber for openings and conduits. We follow the works coordinator’s (OPC) schedule, unit by unit or floor by floor.
- Setting out the partitions from the plans.
- Installing the metal frames: tracks and studs.
- Fitting insulation in the linings, and in the partitions where the contract requires it.
- Fixing the plasterboard, with openings for services and back boxes.
- Taping and jointing, leaving walls ready for painting.
- Internal quality check before handover.
What you receive
The same documents for each of our trade packages: for the technical inspector (bureau de contrôle), the health and safety coordinator (CSPS) and the as-built file (DOE).
- Technical data sheets and technical assessments (avis techniques) of the products
- Site health and safety plan (PPSPS) for the health and safety coordinator
- Documents requested by the technical inspector
- Completion report
- Product data sheets for the as-built file (DOE)
What our quote sets out
- The types of partitions and linings, from the plans and specifications
- The insulation included in the contract
- The data sheets for boards, studs and insulation
- The works schedule
Questions about this trade package
Do you also install the insulation in the linings?
Yes. We install complete insulated linings: frame, insulation and boards, in line with the contract documents.
Do you work on modular construction?
Yes, our crews also work on modular construction projects.
What do you need to quote for it?
The architect’s plans, the specifications (CCTP) for the package and the detail drawings if there are any. We price from the plans and attach the data sheets of the proposed products.
A package to price?
Send the plans and the specifications (CCTP) for the package. Your quote includes the technical data sheets of the proposed products. Free of charge.