Package 02 · Crawl-space insulation
Crawl-space insulation
In the crawl space, we fix insulation boards beneath the ground floor. They reduce heat loss through the floor, in new builds and energy retrofits alike.

When this trade package comes in
Housing over a crawl space
Ground floor of multi-unit housing, built over a crawl space.
New builds
Boards fixed beneath the floor in line with the contract documents, once the structural work is complete.
Energy retrofits
Insulating an existing floor from below, usually without any work inside the homes.
What we do
In the schedule
We schedule the works with the general contractor and the works coordinator (OPC), according to the progress of the services running beneath the floor. We work from the crawl space, so the levels above remain open to the other trades.
- Checking access to the crawl space and the available height.
- Preparing the underside of the floor.
- Insulation boards fixed beneath the floor, with tight joints.
- Detailing around services, columns and wall edges.
- Internal quality check and completion report.
What you receive
The same documents for each of our trade packages: for the technical inspector (bureau de contrôle), the health and safety coordinator (CSPS) and the as-built file (DOE).
- Technical data sheets and technical assessments (avis techniques) of the products
- Site health and safety plan (PPSPS) for the health and safety coordinator
- Documents requested by the technical inspector
- Completion report
- Product data sheets for the as-built file (DOE)
What our quote sets out
- The thermal resistance required by the specifications (CCTP)
- The proposed insulation boards and how they are fixed
- The technical assessment and product data sheets
- The works schedule
Questions about this trade package
Does the crawl space need to be accessible?
Yes, we fix the boards from inside the crawl space. Tell us the available height and the access points in your request; we check on site if needed.
What do you need to quote for it?
The ground floor plans, the floor area, the insulation or thermal resistance set in the specifications (CCTP), and the tender date.
Is this suitable for retrofits?
Yes. The boards are fixed from below: the homes can usually stay occupied and no floor finish has to be redone.
Related projects
Coulounieix-Chamiers (24)
Legendre
Crawl-space insulation, 400 m²
A package to price?
Send the plans and the specifications (CCTP) for the package. Your quote includes the technical data sheets of the proposed products. Free of charge.